Wind Tunnel Test Management Approach       

​

Phase 1: Test / Project Definition

​

Define & Document Top-Level Objectives, Goals, & Requirements

- Test Conditions & Environment (Mach#, Re#, Flow Uniformity, ..)

- Test Article Sizing & Fidelity (Scale, Tolerances, Surface Finish, ..)

- Data / Instrumentation (Force, Pressure, Flow Visualization, ..)

- Accuracy & Repeatability Requirements (Filter, Sample Rates,..)

- Budget / Cost

- Schedule / Project Timeline

- Personnel / Staffing

​

Communication of Requirements, Early Involvement of Test Team

- Project Meetings

- Project Reports

- Presentations

- Status Updates

- Interactions, Phone Calls, E-mails,

 

Phase 2: Test / Project Planning & Preparation

 

Develop Detailed Project / Test Plan

- Transition Program Requirements Into Test Requirements
- Define Test Team & Responsibilities
- Prioritize Objectives (Primary, Secondary, ..)
- Coordinate Project Schedule & Budget with Test Team
- Verify Test Facility, Vendor, and Supplier Contracts
- Risk Evaluation & Mitigation; Manage “Requirements Creep”
- Finalize Instrumentation Selection, Identification, Set-up Sheets
- Define DAQ and Reduction Methods (Equations, Corrections, ..)
- Define Test Procedures & Optimize Test Sequence
- Perform Hardware Checks (Fitment, Measurement, Structural, ..)
- Write Project / Test Plan Report
- Prepare and Maintain To-Do List
- Communication (Meetings, Tele-cons, Status Reports, ..)

​

Define Test Article, Detailed Design & Fabrication

- Finalize Conceptual Design, Perform Detailed Design
- Vendor Selection Process (SOW, Proposal Review, Contracts, ..)
- Part Identification Scheme
- Instrumentation Positioning, Routing, & Identification
- Part Alignment & Positioning Scheme
- Define Installation Procedures
- Document Test Article Geometries (Installation, Data Reduction, ..)
- Stress Analysis & Report
- Configuration & Part Drawings
- Inspection Requirements & Acceptance Criteria
- Perform Pre Delivery Check-Out / Buy-Off (in person)
- Shipping & Packaging Requirements
- Communication (Meetings, Tele-cons, Status Reports, ..)

​

Perform Pre-Test Build-Up and Preparation Prior to Test

- Hold Pre-Test Meeting
- Coordinate and Direct Test Activities
- Organize and Prepare Test Hardware / Instrumentation
- Document Activities (Photos, Project Log, ..)
- Instrumentation Installation, Routing, Calibration
- Perform Leak & Continuity Checks (Pressures)
- Perform Check Loads (Metric/Strain Gauged Parts)

​

Phase 3: Test / Project Execution

 

Execute Test Program

- Coordinate and Direct Test Activities
- Document Test Activities in a Daily Test Log
- Maintain Run Schedule / Matrix / As-Run Log
- Direct & Assist Configuration Changes
- Document & Photograph Configuration Changes
- Monitor & Validate Instrumentation Measurements
- Track Test Completion Progress, Efficiency, and Performance
- Communication of Current Test Status

​

Phase 4: Test / Project Close Out

 

Post Project / Test

- Hold Post Test / Project Meeting
- Verify Project Objectives Were Met
- Document Lessons Learned
- Compile Test / Project Addendum (Notebook & Electronic)
- Update Drawings & Documents to Reflect Changes
- Write Post Project / Test Report
- Inventory & Pack Hardware / Instrumentation for Storage / Shipping
- Inventory & Pack Test Article for Storage / Shipping

 

Wind Tunnel Facility Experience (has tested at):

​

Swift Engineering 8ft x 9ft Low Speed Rolling Road Wind Tunnel -- Decommissioned

Boeing 20 x 20 Low Speed V/STOL Wind Tunnel (BVWT)

Boeing 4ft x 4 ft Polysonic Wind Tunnel (PSWT)

NASA Glenn 9ft x 6ft Icing Research Tunnel (IRT)

NASA Langley 16ft Transonic Wind Tunnel-- Decommissioned

NASA Ames 11ft x 11ft Transonic Wind Tunnel (UPWT)

NASA Glenn 8ft x 6ft Supersonic Wind Tunnel

Arnolds 16ft x 16ft Transonic Propulsion Wind Tunnel (16T)

National Research Council Canada 2m x 3m Low Speed Wind Tunnel

Aircraft Research Association 8ft x 9ft Transonic Wind Tunnel (TWT)

R.J. Mitchell 8ft x 11ft Low Speed Rolling Road Wind Tunnel

Southampton 5ft x 7ft Low Speed Rolling Road Wind Tunnel

bottom of page